Reference List

Below listed are the most significant environment related projects TEKON accomplished:

Country Year from - to Project, Investor and Position
Serbia 2013 Waste management plans for hydro power plants of Electric Power Industry of Serbia / ELECTRIC POWER INDUSTRY OF SERBIA
Serbia 2012 Environmental audits of 11 public companies within ELECTRIC POWER INDUSTRY OF SERBIA/ ELECTRIC POWER INDUSTRY OF SERBIA
Serbia 2011 -2012 Chemical accident risk assessment for fertilizer factory HIP AZOTARA Pančevo/ HIP AZOTARA Pančevo
Serbia 2011 - 2012 Chemical accident risk assessment for Makiš 2 / JKP BEOGRADSKI VODOVOD I KANALIZACIJA Beograd
Serbia 2011 -2012 Waste information system implementation in hydro power plants of Electric Power Industry of Serbia / ELECTRIC POWER INDUSTRY OF SERBIA
Serbia 2010 - 2011 Waste information system implementation in coal opencast mines of Electric Power Industry of Serbia / ELECTRIC POWER INDUSTRY OF SERBIA
Serbia 2010 -2011 Chemical accident risk assessment for Thermal Power Plant NIKOLA TESLA B/ ELECTRIC POWER INDUSTRY OF SERBIA
Serbia 2009 - 2010 Chemical accident risk assessment for Thermal Power Plant NIKOLA TESLA A/ ELECTRIC POWER INDUSTRY OF SERBIA
Republic of Srpska 2009 -2010 Design and implementation of QMS, EMS and OHSMS system for the coal open-cast mine Omarska/ ARCELLORMITTAL Prijedor
OMARSKA / ARCELOR MITTAL Prijedor
Serbia 2009 - 2010 Waste information system implementation in thermal power plants of Electric Power Industry of Serbia / ELECTRIC POWER INDUSTRY OF SERBIA
Serbia 2009 Environmental monitoring system design for the ‘’Tamnava West’’ Lignite Mine/ RB KOLUBARA
Serbia 2008-2009 Project „EPS II Power II – Tamnava West Lignite Mine – Consulting Services for Lender's Environmental Engineer“/EBRD
Serbia 2008 Environmental audit for the locations of Tigar technical rubber division of Tigar AD, Pirot - environment due diligence (Environmental audit type 2, including drilling platforms, wells, sampling and laboratory analysis and result interpretation)/ MICHELIN
Serbia 2008 Environmental audit for the locations of Tigar technical rubber division of Tigar AD, Pirot - environment due diligence (Environmental audit type 1 – site visit and document analysis)/ MICHELIN
Serbia 2008 Environment impact assessment study for the construction of a gas station in Pancevo/ AGRODIZEL Pancevo
Serbia 2008 Environment impact assessment study for constructing a grain silo in Bavaniste (4.050t capacity)/ BANATSKI KLAS Pancevo
Serbia 2008 Environment impact assessment study for constructing a mushroom composting plant /CHAMPICOMP Kovin
Serbia 2008 Environment impact assessment study for constructing a meat processing plant/ ECCOLO Beograd
Serbia 2007-2008 Implementation of EMS in conformance with ISO 14001 in the following organizations: PD „ELEKTROSRBIJA“, PD „ELEKTRODISTRIBUCIJA BEOGRAD“, PD „RB KOLUBARA“, PD „ELEKTROVOJVODINA“ and PD „PANONSKE ELEKTRANE“/ELECTRIC POWER INDUSTRY OF SERBIA
Serbia 2008 Environmental audit for the acquisition of brewing companies in Pancevo and Zajecar – environment due diligence (type 1)/ HEINEKEN
Serbia 2008 Environment impact assessment study for constructing a highway section/ AD VOJVODINA PUT Pancevo
Serbia 2008 Environment impact assessment study for constructing a gas station in Grebenac/ ZZ EKOLOGIJA Grebenac
Serbia 2008 Environment impact assessment study for constructing a meat processing plant/ ProAM Beograd
Serbia 2007-2008 Design and implementation of a waste management information system in JP „ELEKTROPRIVREDA SRBIJE“/ ELECTRIC POWER INDUSTRY OF SERBIA
Serbia 2007 Environment impact assessment study for constructing a vehicle repair station/ JKP ATP Pancevo
Serbia 2007 Environmental audit for acquisition of the Rodic MB brewing company in Novi Sad – environment due diligence (type 1)/ HEINEKEN
Serbia 2007 Environment impact assessment study for constructing a plant in agriculture organization „Paor“/ Deliblato
Serbia 2007 Value assessment of the mine and mine fields of RTB BOR and environmental audit for the acquisition of RTB BOR – technical and environment due diligence /BASIC ELEMENT – SMR Russia
Serbia 2007 Chemical accident risk assessment for the fruit processing plant /JUZNI BANAT AD Bela Crkva
Srbija 2006 ‘’Waste management in EPS – Stage 2 and Stage 3” study/ ELECTRIC POWER INDUSTRY OF SERBIA
Serbia 2006 Environmental audit and pollution risk analysis (environmental due diligence) for the privatization of FAM Kruševac/ Agency for privatization of Republic of Serbia
Serbia 2006 Environmental audit and pollution risk analysis (environmental due diligence) for the privatization of BIP Belgrade/ Agency for privatization of Republic of Serbia
Republic of Srpska 2006 Integral quality, environment and OH&S management system implementation in conformance with ISO 9001, ISO 14001 and OHSAS 18001 in the lignite open mine Stanari/ EFT GROUP LTD
Serbia 2006 Environmental audit and pollution risk analysis (environmental due diligence) for the privatization of RADIJATOR Zrenjanin/ Agency for privatization of Republic of Serbia
Serbia 2006 Environmental audit and pollution risk analysis (environmental due diligence) for the privatization of FKL Temerin/ Agency for privatization of Republic of Serbia
Serbia 2006 Environmental audit and pollution risk analysis (environmental due diligence) for the privatization of MINEL TRANSFORMATORI Ripanj/ Agency for privatization of Republic of Serbia
Serbia 2006 Environmental audit and pollution risk analysis (environmental due diligence) for the privatization of OPTIKA Belgrade/ Agency for privatization of Republic of Serbia
Serbia 2006 Environmental audit and pollution risk analysis (environmental due diligence) and ISO 14001 conformity audit / GALENIKA PHYTOPHARMACY Belgrade
Serbia 2006 The impact of TE Nikola Tesla on the Obrenovac and surrounding areas air quality continual monitoring system/ JP TENT Obrenovac
Serbia 2005 The study of ‘’Environmental protection in electric-distribution plants’’/ ELECTRIC POWER INDUSTRY OF SERBIA
Serbia 2005 Environmental audit and pollution risk analysis (environmental due diligence) for the privatization of VITAL Vrbas/ INVEJ Belgrade
Serbia 2004 Environmental audit and pollution risk analysis (environmental due diligence) for the privatization of RUBIN Kruševac / INVEJ Beograd
Serbia 2004 Environmental audit and pollution risk analysis (environmental due diligence) for the privatization of BIP, JAGODINSKA PIVARA and VRSACKA PIVARA brewing companies/ Agency for privatization of the Republic of Serbia
Serbia 2004 Environment impact assessment study for solid state pharmaceuticals processing plant GALENIKA AD, Belgrade/ GALENIKA AD
Serbia 2004 Assistance for Indicators and Reporting Systems Development for Implementing EEA Framework and Procedures in Albania, Serbia and Montenegro, EUROPEAN ENVIRONMENT AGENCY
Serbia 2003- 2004 Projecting and implementing of EMS ISO 14001 in “SPEKTAR” Gornji Milanovac/ “SPEKTAR” Gornji Milanovac
Serbia 2003 - 2004 Projecting and implementing of EMS ISO 14001 in “Karbon”, Aranðelovac/ "KARBON" Aranðelovac
Serbia 2003 -2004 Projecting and implementing of EMS ISO 14001 in Chemical industry “Prvi maj”,Cacak/ "PRVI MAJ" Cacak
Serbia 2004 Environment impact assessment study for the re-opening of coal mine "JERMA" / PP HRAM
Serbia 2003 -2004 Projecting and implementing of EMS ISO 14001 in “Cementni proizvodi”, Vlasotince/ "CEMETNI PROIZVODI" Vlasotince
Serbia 2003 Environmental audit and pollution risk analysis in BEOPETROL, Beograd (Environmental Due Diligence)/ LUKOIL, Russia
Serbia 2002-2003 The study of ‘’Waste management in EPS and the re-using possibilities"/ ELECTRIC POWER INDUSTRY OF SERBIA
Serbia 2002-2003 Environment capacity building measures in Serbia 2002/ European Agency for Reconstruction (EAR)
Serbia 2003 Environmental audit and pollution risk analysis in TOZA MARKOVIC, Kikinda (Environmental Due Diligence)/ EBRD
Serbia 2003 Environmental audit and pollution risk analysis in APATINSKA PIVARA, Apatin (Environmental Due Diligence)/ HEINEKEN
Serbia 2001 - 2002 Removing the consequences of the bombing for HIP PETROHEMIJA, UNEP/UNOPS