Mineral resources - reference list
Project name and short description |
Country/Year/Investor /Beneficiary/Partners |
Development of environment monitoring system for opencast mine PK Tamnava – Zapadno poljePreliminary design for environment monitoring system for the mine(ambient dust concentration, soil quality, noise level, quality and level of underground and surface waters). |
Serbia 2009
|
Technical control of "Program of supplemental geology exploration works for lignite deposit Tamnava – Zapadno polje in Kolubara lignite basin”Technical control of the program according current Serbian legislation on geological exploration. |
Serbia 2009
|
Project “EPS II Power II – Tamnava West Lignite Mine – Consulting Services for Lender's Environmental EngineerSupervision and technical support to implementation of Environment Action Plan on lignite opencast mine PK Tamnava – Zapadno polje in Kolubara lignite basin. |
Serbia 2008
|
Technical control of "Program of detail geology exploration works of lignite deposit Polje E in Kolubara lignite basin"Technical control of the program according current Serbian legislation on geology explorations. |
Serbia
2008
|
Development and implementation of QMS and EMS according ISO 9001 and ISO 14001 standards in RB KOLUBARADevelopment and implementation of integral management system according to ISO 9001 and ISO 14001 in EPS’ subsidiary PD RB KOLUBARA which operates four opencast lignite mines in Kolubara lignite basin. Certification of the system was successfully performed. |
Serbia 2007 - 2009
|
Privatization of RTB Bor – Mineral base and mining works assessmentAssessment of value and prospect of mineral base and existing and future mining works. Assessment conducted on the base of numerical modeling and detail site audit. In the final report the investment and business plans were presented, with annual concentrate quantities, quality and prices at the smelter gate. |
Serbia 2007
|
Technical control of "Program of supplemental geology exploration works for lignite deposit Tamnava – Zapadno polje in Kolubara lignite basin";Technical control of the program according current Serbian legislation on geology explorations.. |
Serbia 2007
|
EPS II Power II - Tamnava west lignite Mine - Project Management Services for Project Implementation Unit (PIU)Technical support and project management consulting for construction and erecting of II BTO overburden system (excavator – belt conveyers – spreader) on opencast mine PK Tamnava – Zapadno polje. Overall investment for system construction is around EUR 85mln. |
Serbia 2006 -
|
Development and implementation of an integral management system at lignite opencast mine STANARIDevelopment and implementation of an integral management system according ISO 9001, ISO 14001 and OHSAS 18001 standards. The company has been successfully certified. |
Republika Srpska 2006
|
Study “Posibility of selective mining of diatomei earth in Kolubara lignite basin”Study was conducted in order to investigate possibility of selective mining of diatomei earth in Kolubara lignite basin.
|
Serbia 2006 INSTITUT ZA HEMIJSKE TEHNOLOGIJE, Beograd
|
Feasibility study „Feasibility of resettlement of capital infrastructure, watercourses and residential settlements from Kolubara lignite basin as function of opencast mining developmentMain aim was to assess technical possibilities and feasibility for resettlement of capital infrastructural objects (Railroad Beograd – Bar, Highway Ibarska magistrala), existing watercourses and residential settlements from Kolubara lignite basin as function of development of opencast mining. The Study proved feasibility and was used for business decision about resettlement of village Vreoci as function of extension of opencast mine Field D. |
Serbia 2006
|
Calculation, classification and elaboration of coal reserves in unexplored part of lignite deposit “Kovin”.According to legal obligation of periodical upgrade of Elaborates on reserves and to secure reserves for future mine development Tekon conducted calculation, classification and elaboration of reserves. Elaborate on reserves was verified by Committee for Mineral Reserves of Republic of Serbia. |
Serbia 2004-2005
|
Detail geology exploration of unexplored part of coal deposit “Kovin”.Execution of detail geology works in order to secure additional coal reserves as well as to assess possibility of selective excavation of gravel and sends. During the project 42 boreholes were drilled, of which 5 were from a platform at Danube River; carotage was conducted; seismic measurement at 2 profiles, mapping and sampling, lab analyzes and results interpretation and elaboration. |
Serbia 2003-2004 ELEKTROPRIVREDA SRBIJE, Beograd
|
Study “Possibility for sale of brown coal on market of Serbia and Montenegro”Market research study in order to support business decision for re-opening of underground coal mine „JERMA“ near Pirot in Serbia..
|
Serbia 2003-2004
|
Study "Geological conditions for safe and feasible underground coal mining in Serbia – active mines".Identification of parts of deposits suitable for application of modern excavation methods and equipment in active coal underground mines in Serbia. Study was successfully finished.. |
Serbia 2003
|
Assessment of a concession feasibility for “Seventh oil block in Iraq”Tekon was engaged in reprocessing of survey data and feasibility assessment for concession lease. The project was finished in 2003 with significant results accepted by the client. Further activities have been envisaged but still await peaceful situation in the country. |
Irak 2003
|
Study "Geological conditions for safe and feasible underground coal mining in Serbia – inactive mines".Identification of parts of deposits suitable for application of modern excavation methods and equipment in inactive coal underground mines in Serbia. The study was successfully finished. |
Serbia 2002
|
Study "Geological conditions for safe and feasible underground coal mining in Serbia – Aleksinac i Ćirikovac".Identification of parts of deposits suitable for application of modern excavation methods and equipment in coal underground mines Aleksinac i Ćirikovac in Serbia. Study was successfully finished. |
Serbia 2001
|
Study „Research of market potential for sale of anthracite water filters”The market research study conducted as part of efforts to find additional revenue sources in anthracite underground mine Vrška Čuka. |
Serbia 1997
|
Calculation, classification and elaboration of coal reserves of deposit Centralno polje of coal mine Rudnik ŠtavaljAccording to legal obligation of periodical upgrade of Elaborates on reserves and to secure reserves for future mine development Tekon conducted calculation, classification and elaboration of reserves. Elaborate on reserves was verified by Committee for Mineral Reserves of Republic of Serbia. |
Serbia
1996
|
Development of main mining design project for opencast mine of decorative stone BUKOVIKDevelopment of main mining design project for decorative stone opencast mine PK "BUKOVIK" from Bukovik, according to legislation of Republic of Serbia. |
Serbia 1994
|
Calculation, classification and elaboration of coal reserves of deposit Kosovo and Metohija lignite basinsTekon conducted deposit numerical modeling, reserves calculation, classification and elaboration for two biggest lignite basins at Western Balkans – Kosovo and Metohija lignite basins. Tekon proved reserves of 14 billion tons of lignite. Elaborate was successfully verified by Committee for Reserves of Republic of Serbia. |
Srbija 1995
|
Calculation, classification and elaboration of coal reserves of deposit Jarando and Tadenje of the mine Ibarski rudniciAccording to legal obligation of periodical upgrade of Elaborates on reserves and to secure reserves for future mine development Tekon conducted calculation, classification and elaboration of reserves of deposits JARANDO and TADENjE. Elaborate on reserves was verified by Committee for Mineral Reserves of Republic of Serbia. |
Serbia 1995
|
Optimization of existing exploitation systems at opencast mines TREŠNJA and ČOKOĆE of a cement factory NOVI POPOVACDue to high content of waste (app. 30% of overall excavated volumes was dumped as waste), the client tired to find sustainable solution which will decrease waste level at opencast mines of limestone and marl TREŠNJA and ČOKOĆE and decrease production costs. During the project realization Tekon developed numerical models; conducted geo-statistic analyzes, modified excavation technology and developed a software application for production planning and quality management. The project was extremely successful because it leads to full elimination of waste. The plant still uses developed software application. |
Serbia 1994
|
Assessment of a feasibility for concession for oil fields Donetsk, Sirtovsk Rodnikovskoe, Romanovskoe and Verzovskoe in Orenburg region in Russian federationThe client bought the initial concession dossier for US 2.000.000 and engaged Tekon in order to assess feasibility of additional investments of US$ 18.000.000 in detail survey works. The assessment was based on the profit margin defined by the client. Study supported business decision on the project future. Tekon advised the client to abandon the project which the client accepted. |
Russian federation 1994 - 1995
|
Studija Study “Possibility for utilization of waste from the separation of coal mine Baljevac na Ibru”The client Ibarski rudnici from Baljevac engaged Tekon in order to research possibility for utilization of waste from the mine separation and to investigate possibility for production costs reduction. Study proposed mitigation measures to be applied in order to fulfill the project objectives. |
Serbia 1992
|